
Three Montegut men cited for shrimping violations in Bayou Pointe-Aux-Chenes
November 14, 2024
Acadian Ambulance and National EMS Academy hold ribbon cutting for Thibodaux Operations and Education Facility
November 14, 2024The Terrebonne Parish School District recently completed several highly-anticipated renovation projects on local schools, with more improvements planned and currently underway.
“Our school district assembled a Facility Task Force in 2019 to evaluate every school, and develop a long term facilities master plan,” explained TPSD Superintendent Bubba Orgeron. “Normally, a plan like that would sit for a long time while we waited for funds and approvals– but when Hurricane Ida hit in 2021, it provided a window for us to follow through on the recommendations while we were going to be completing necessary renovations anyways. We wanted to do it right.”
- Acadian Elementary Repairs
- H.L. Bourgeois Repairs
Some of the recommendations for multiple school sites included important upgrades such as improved safety, new HVAC systems and upgrades, addressing electrical issues for technology needs, complete replacement of floors, walls, and windows, and more.
Through a mixture of funds from the District, the American Rescue Plan Act, FEMA, and insurance claims, TPSD was able to make huge strides on their renovation plans this year, and is proud to unveil the completed upgrades at several schools across the district.
Major repairs slated for 2025-2026 include the complete renovation of South Terrebonne High School, Terrebonne High School, and Ellender Memorial High School.
- Broadmoor Elementary
- Ellender Memorial High School
“Our goal is well-kept, well-maintained, modernized schools that are conducive to learning,” said Orgeron. “Windows, floors, ceilings, lighting, air conditioning, everything plays a role in creating a good learning environment for students. These simple things can go a long way, and it will make a big difference in our communities.”
Specific renovations completed or underway are as follows:
Acadian Elementary School
- Painted hallways
- New ceiling tiles
- New LED lighting
- New HVAC systems in cafeteria
- New flooring
- New windows
- New exterior walls
- New modular building
- Newly installed perimeter fencing
Bourg Elementary School
- New bus awning
- New awning to modular building
- New flooring in cafeteria
- New ceiling tiles in cafeteria
- HVAC repairs in cafeteria
- Repaired fencing in bus loading area
- Repaired vinyl siding/fascia/gutters
- Replaced damaged shed
- New modular building
H.L. Bourgeois High School
- New ceiling tiles
- New LED lighting
- New HVAC system
- New flooring
- Auxiliary gym refurbished
- Tennis courts resurfaced
- New auditorium lighting
- New baseball press box/concessions
- Roof repairs
- Perimeter to fencing repairs
Broadmoor Elementary School
- New HVAC sustem
- New ceiling tiles
- New awning in bus loading area
- Repaired building signage
- Repairs to gutters
- Repairs to floor tiles
- Repairs to ceiling tiles/LED lighting
- New modular building
- Newly-installed perimeter fencing
- New shed
Caldwell Elementary School
- New exterior shed
- Replaced window panes
- Replaced ceiling tiles
- Roof panel repairs
- Replaced floor tiles
- Replaced gutter down spouts
Bayou Blue Elementary School
- New ceiling tiles/LED lighting
- New gutters/fascia panels/soffit
- HVAC replacement
- New floor tiles
- New sign
- New roof on portable building
- Redesigned parent drop off area
- Security Fencing
- New canopy/bus circle
Dularge Elementary School
- Painted hallways
- New ceiling tiles
- New LED lighting
- New HVAC system
- New flooring
- Painted classrooms
- Replaced fascia/gutter/roof on shed
Ellender Memorial High School
- Tennis courts resurfaced
- Repairs to baseball field
- New/temporary weight room and locker room
- Newly constructed softball field
- Demolition of existing school beginning in 4th quarter of 2024
- New school planned for future
Evergreen Junior High School
- Painted hallways
- New ceiling tiles
- New LED lighting
- HVAC repairs
- New floor tiles
- New windows
- Repaired interior/exterior walls
- Roof repairs
- Repairs to choir/gym/band areas
Grand Caillou Elementary School
- New construction to replace the original school destroyed by Hurricane Ida
Grand Caillou Middle School
- Repaired flagpoles
- Repairs to front bus awning
- Repairs to front stairwell/handrails
- New modular building
- Newly installed perimeter to fencing
Houma Junior High School
- Painted hallways and stairwells
- New ceiling tiles throughout entire building
- Lew LED lighting throughout entire building
- HVAC repairs
- New floor tiles
- Roof repairs
- Wall repairs
- Repaired windows
- Replaced vinyl siding/fascia/gutters
Legion Park Elementary School
- Exterior/interior painting
- New HVAC system
- Window replacement
- New ceiling tiles
- New LED lighting
- New shed
- New floor tiles
Lisa Park Elementary School
- New window panes
- New ceiling tiles
- New floor tiles
- New storage shed
- New gutters on front façade
- New roof on portable building
Montegut Elementary School
- New floor tiles
- New LED lighting
- New ceiling tiles
- New outdoor shed
Montegut Middle School
- New floor tiles
- New LED lighting/ceiling tiles
- New concrete foundation around perimeter of building
- New band trailer
- New carpet in library
- New windows in one classroom
- New awnings/fascia on front of building
- Sheetrack work in corridors and cafeteria
- New gutter system
- Roof repairs
- Repaired HVAC system
Mulberry Elementary School
- New HVAC in original building
- New roof on original building including fascia/soffit
- Portables removed from property
- New ceiling tiles
- New LED lighting
- New floor tiles
- New exterior/interior wall replaced in rear of original building
Oaklawn Middle School
- Complete HVAC replacement
- Complete window replacement
- Significant roof repairs
- Exterior/interior painting
- Replacing gymnasium/bus canopy
- Concrete/parking lot repairs/additions
- Cafeteria/kitchen upgrades
- New secured vestibule entry
- Security fencing
Oakshire Elementary School
- Roof repairs
- New ceiling tiles
- New floor tiles
- HVAC repairs/replacement
School for Exceptional Children
- Handicapped accessible raps added
- Awning repairs
- Fascia/roof repairs
- Gutter repairs
- New ceiling tiles
- New floor tiles
- Interior painting
- Washer/dryer connections added
Schriever Elementary School
- New ceiling tiles
- New floor tiles
- HVAC repairs
- Roof replacement on modular building
- Soffit and fascia replacement/repairs
- Roof repairs on main building
South Terrebonne High School
- Complete renovation of campus
- Baseball field repairs
- Tennis courts resurfaced
- New softball field
- Repairs to track/stadium/scoreboard
- Renovated competition gym
- Renovated locker room/weight rooms
South Terrebonne Middle School
- New construction to combine Montegut Middle School and Lacache Middle School
Southdown Elementary School
- Repaired fascia/soffit
- Repaired rear bus shelter canopy
- Roof repairs
T.A.P.P.S.
- New ceiling tiles in cafeteria
- Floor abatement and removal
- Temporary walls repaired
Terrebonne High School
- Full HVAC renovation
- New softball field
- Canopy repairs
- Repairs to girls’ gym
- Repairs to covered walkway
- Baseball field press box repair
- Roof/gutter repairs
- Tennis courts resurfaced
- New proposed campus redesign
Little Caillou Elementary School
- New elevated construction to replace the original school destroyed by Hurricane Ida
- Property address to remain at original location
Village East Elementary School
- New flooring
- New ceiling tiles
- New LED lighting
- Portable building removed
- Facia/roof repairs
For more information, please contact the Terrebonne Parish School District.